How does GSOC support generation?

On the generation side, GSOC handles the energy demands moment by moment for the EMCs, balancing load with the economic dispatch of generation plants and economy energy purchases. 

     Oglethorpe Power operates several power plants across the state. These plants supply — or generate — much of the electricity the EMCs need, depending on the demand. Based on that hour’s load forecast, the GSOC energy control center determines which units should economically be running and generating electricity.

     Sometimes, it’s cheaper to purchase electricity from power marketers or other sources than it is to start up a unit, especially during peak-load periods or if a unit is down for maintenance. The Member scheduling agents — or the Members themselves — make these purchases. 

clear_spacer_1px.gif

     As a customer's load demand changes continuously throughout the day, electricity must be available the instant the customer needs it. Electricity cannot be generated and stored for use at a later date, so it's important that generation and purchases meet the load demand as closely as possible.

     Therefore, monitoring and meeting the demands — which are updated every six seconds — are one of GSOC’s most important roles in the load balancing process. Our goal is to meet EMC load and maintain reliability at the lowest possible cost. Together, generation plus purchases meet the load requirements for that hour. GSOC dispatches the generation plus purchases to balance to the EMC load.

 